TIMCO Building
Yellow Creek Port
Iuka, MS 38852
30,000 SF clear span industrial building with 40’ clearance; located on an 18 acre site with water frontage; designed for bridge crane up to 40 tons; located near Yellow Creek Port, the steel coil multi-modal center of the Mid-South. Located in a metal fabrication cluster.
The center ceiling clearance is 46′. The building is designed for a bridge crane up to 40 tons; the bridge crane can exit building directly into water. The property is adjacent to the Yellow Creek Port and the Norfolk Southern rail line.